Section-44, Routing the mainline power cables, not connecting to the UPS

Procedure

  1. Locate the mainline power cables boxes in Box 1 of 10.
  2. Determine the power source for the mainline power cables or each UPS (E61, E62).
    Note: It is strongly recommended the customer use two different power sources.
    • If the source power connectors are external to the rack, the mainline power cables are 4.3 meters.
    • If the source power connectors are internal to the rack, the mainline power cables are less than 2 meters.
  3. Route, but DO NOT CONNECT the mainline power cables from the power source to the UPS.